File size: 27,725 Bytes
04dae2a |
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75 76 77 78 79 80 81 82 83 84 85 86 87 88 89 90 91 92 93 94 95 96 97 98 99 100 101 102 103 104 105 106 107 108 109 110 111 112 113 114 115 116 117 118 119 120 121 122 123 124 125 126 127 128 129 130 131 132 133 134 135 136 137 138 139 140 141 142 143 144 145 146 147 148 149 150 151 152 153 154 155 156 157 158 159 160 161 162 163 164 165 166 167 168 169 170 171 172 173 174 175 176 177 178 179 180 181 182 183 184 185 186 187 188 189 190 191 192 193 194 195 196 197 198 199 200 201 202 203 204 205 206 207 208 209 210 211 212 |
INTRODUCTIONIn 2015, NASA Ames Research Center conducted the "Big Data, Data Analytics, and Net-enabled ATM and Airspace Operations Project" to identify air traffic management (ATM) functions that can benefit from networked, net-enabled, and/or cloud-based architecture.The objective of this effort was to investigate methodologies that could reduce duplication; reduce cost of operations and upgrades related to air traffic management, airline operations, and flight operations; and provide data analytics.Additionally, potential "fee for service" mechanisms for funding the development and operation of a solution application were to be considered.A subject matter experts (SME) team with experience in ATM, airline operations, airport operations, and big data architectures was assembled to tackle this challenge.Five topics were developed by the team related to the National Airspace System (NAS) performance, they are i) Weather Impacts to Aviation, ii) Big Data and Modeling Infrastructure, iii) Integrated Gate Turnaround Management, iv) Flight Operations Control Management System, and v) Departure and Arrival Management.After a team review, the Integrated Gate Turnaround Management (IGTM) was selected to proceed with a prototype demonstration with the following guidelines.• Use of simulation in the ATM environment • Focus on airline side and ramp operations o Desire to leverage data to manage the uncertainties in nominal and non-nominal, and o Provide performance monitoring and collaborative decision tools to promote integrated gate turnaround operations to meet the on-tie and/or predictable performance upon arrival and departure at the terminal CONCEPT AND BENEFITS OF THE INTEGRATED GATE TURNAROUND MANAGEMENTThe concept of Integrated Gate Turnaround Management (IGTM) is to leverage i) the data analytics technologies with multiple historical database and live data to establish bounds of uncertainties of dependent parameters associated with NAS performance, [1,2] ii) a distributed data network shared by stakeholders, [3] and iii) collaborative decision tools [4,5] to optimize the arrival and departure performance at an airport through en route, terminal, and the gate.The IGTM concept is shown in Figure 1.By providing predictable traffic performance information under nominal and off-nominal conditions, e.g., adverse weather, high/low traffic density, runway condition due to rain and/or ice, available flight crew, available ground crew, ground stop orders, and number of transient passengers, collaborative decision tools can be developed for individual stakeholders to optimize the performance under an integrated environment.This coordinated optimization will prevent localized optimization that could lead to system-wide delay. THE IGRM PROTOTYPEThe IGTM prototype was defined for the service space starting from the final metering fix upon arrival at an airport to takeoff or wheel-off.This will allow the prototype to be integrated with automation tools for terminal and en route airspace operations for future applications.The IGTM prototype covers the flight and ground operations from approach to runway, landing and wheels-down, to taxi-in from the active movement area to the in-bound transfer spot for handover by ATC to ramp control, lastly, to taxi in the ramp area to arrive at the assigned gate.The aircraft, once parked at the gate, would then undergo gate turnaround operations after which the aircraft reverses the process with gate pushback, taxi-out to the out-bound transfer spot from ramp control to ATC, taxi-out to the departure queue, and ending at takeoff to meet the departure slot time.This complex process involves the controlling authorities and decision stakeholders which includes the ATC ground controllers, that have authority for the airport movement area, and the airport/airline ramp controllers, that have authority for the airport non-movement area.The airline operators, airline dispatchers, pilots and ground handling personnel who determine the readiness of the airplane are also stakeholders in this process.The system architecture of the IGTM prototype is shown in Figure 2. The prototype has eight major components, listed below.Descriptions of these components are discussed in following paragraphs.1. IGTM Model/Controller, which controls the IGTM simulation and collaborative decision tools. 5. SOSS JMS Service Adaptor, to translate data between the SOSS and the IGTM Controller.6. IGTM Graphic User Interface (GUI) including the Dashboard, which provides the interface to the stakeholders.7. ActiveMQ, an open source broker with a Java Messaging Service (JMS), provides the communications network for servicing the data exchanges.8. Mongo server or MongoDB, an open source database server for the IGTM prototype. IGTM Host System/Launch ScriptsThe IGTM prototype is entirely written in JAVA and works with products, which are OS agnostic and can run on Linux, Windows or a MAC system.The prototype is a collection of 8 processes (See Figure 2, excluding the scenario configuration) that can be configured through XML to run on any number of systems.Scenario configuration is completed pre-simulation, by loading the desired simulated case files into MongoDB.The prototype was designed to allow any number of GUI/Dashboards users from multiple stakeholders and Model/Controllers exchange messages through the ActiveMQ Bus.By modifying the host, port, database and transport prefix in the various XML files one can reconfigure the process home system.Mongo itself can be configured to run on a clustered system solely by making changes in its XML files and the configuration files of the Model/Controller/BAI and the AOC components.These modifications can be made to increase the overall application performance.Modifications to the ActiveMQ configuration can increase the number of throughput channels and the volume of traffic allowed to pass through each channel.The launch, configuration, and control of the IGTM processes were accomplished with several Linux Bash scripts, which were called from a master script.All major events are captured in log files and are visible in the standard output.Data collection for the events are captured on the MongoDB server. IGTM Model/ControllerThe IGTM Model/Controller, or Controller for short, is an event driven process.The Controller used the data from AOC App, which provided the airline scheduled data, BAI App, which provided the estimated event performance (in this demonstration the mean and standard deviation, σ, of a specified event performance from historical data was used), SOSS for actual flight event data, and commands from the GUI, which provides inputs from the stakeholders for collaborative decision making or gaming on a specific event.The events modeled in the prototype are listed below. i.Final metering fix ii.Wheels Down (or touchdown) iii.Inbound spot iv.Gate Arrival/Parked v.Gate turnaround (based on completion of all the gate activities) vi.Push back vii.Outbound spot viii.Departure queue ix.Wheels Up (Takeoff)For each flight, three sets of time performance related data, Scheduled Time, Estimated Time, and Actual Time, are required for each event as shown in Figure 3. Scheduled event time, T i_Scheduled , for an Event i as listed above for individual flights was drawing from the AOC App.Actual event time, T i_Actual , came from the Surface Operations Simulator and Scheduler (SOSS).Estimated event completion time, T i_Estimated was calculated based on the mean and standard deviation (σ) from the BAI App on a specific event as shown in Equation 1.T Estimated_i = T Estimated_i-1 + t Estimated_i-1_to_i(1) where T is the simulation time, e.g., in zulu in seconds i denotes an event, e.g., arrival at the gate i-1 denotes a previous event, e.g., inbound spot t is the duration rom Event i-1 to Event iThe time to take from Event i-1 to Event i is defined in Equation 2.t Estimated_i-1_to_i = Size of the Event/Rate of the Event (2)An example for the Inbound Spot Time, "Size of the Event" would be the distance from the touchdown spot to the inbound spot, and the "Rate of the Event" would be the average (or mean) taxi speed.Distance from the touchdown spot to the inbound spot is given by SOSS, and the average taxi speed is provided by the BAI App.At the gate, the "Turnaround Time," where applicable, determines the "Pushback Time" in Figure 3, is dictated or triggered by the completion of following gate activities i.Deplaning of passengers ii.Baggage unloading iii.Fueling iv.Cabin services v.Catering services vi.Baggage loading vii.Flight crew availability viii.Cabin crew availability ix.Maintenance x. Boarding of passengersFor the gate turnaround events, Equation 1 applies to all these events with the same three sets of time performance, i.e., Scheduled, Actual, and Estimated.In these instances, the Deplaning Time was determined by the number of passengers (Size of the Event), and the deplane rate (Rate of the Event).Number of passengers is given by the AOC App, and the average deplane rate is provided by the BAI App.For the turnaround time at the gate, assumptions of critical paths were developed as shown in Table 1.Times for critical paths were calculated, and the estimated turnaround time was determined by the critical path that took the longest time.Additional time delay due to door-close to brake-release, late arrival of the flight crew, and/or cabin crew, and time to receive the clearance for a pushback were included in the turnaround time to determine the Estimated pushback time.OR# OR# OR# OR# OR# OR# OR# Σ# Σ# Σ# Σ# Σ# Σ# OR# TOD# Time# Touchdown# Time# Arrival# Time# Pushback# Time# Outbound## Spot#Time# Departure# Slot#Time# Takeoff# Time# Actual# TOD# Time# Touchdown# Time# Arrival# Time# Pushback# Time# Outbound## Spot#Time# Departure# Slot#Time# Takeoff# Time# Es?mated#by# Computa?on# Descent# Time# Es?mated#by# Analysis# Ramp# Time# TOD# Time# Touchdown# Time# Arrival# Time# Pushback# Time# Outbound## Spot#Time# Departure# Slot#Time# Takeoff# Time# Scheduled# Turnaround# Time# Schedule# Op?miza?on# Normal# Clearance# Op?mal# Clearance# Taxi# Time# Taxi# Time# Normal# Delay# Op?mal# Clearance# OR# Σ# Inbound# Spot#Time# Inbound# Spot#Time# Taxi#In# Time# Inbound## Spot#Time# FMF# Time# FMF# Time# FMF# Time# FMF#-#Final#Metering#Fix# Collaborative Decision ToolsOne of the key concepts of the IGTM is applying collaborative decision-making among stakeholders to gain the integrated NAS performance improvements than the optimization of a local event.Thus, the effects of a single decision-making must be propagated through the NAS beyond the local decision-making domain, and promote the coordinated or collaborative decision-making on scheduling the events.For the IGTM prototype, simple uses cases were developed to demonstrate the tools to mitigate unexpected early and late arrival situations. Airline Operational Control Center (AOC) AppThe AOC App was developed to simulate the data from Airline Operational Control Center (AOC), which consisted of scheduled flight time information at the Final Metering Fix (FMF), wheels-down (touchdown), inbound spot, arrival at the gate, pushback, outbound spot, and wheels-up (takeoff).The AOC data were developed based on the arrivals and departures at Terminal A of Ft.Worth International Airport (DFW).For the prototype, all the AOC data were stored on the Mongo Server to be accessed by the AOC App. BAI AppThe Big Data/Analytics Input (BAI) App simulates the applications of the Big Data and Analytics technologies, which develop predictable results based on the past and current NAS performance according to selected decision trees through a User Interface (UI).The prototype was developed to demonstrate the potential benefits of the BAI data through the UI.For the IGTM prototype, arrival and departure time of flights in December 2013 at Terminal A of DFW were analyzed based on data from the NASA data warehouse.[6] The mean and standard deviation of the turnaround time were identified by analyzing Actual gate-in and gate-out time at each gate per type of airplanes.Estimated time events based on predicted results, in this case, the mean and standard deviation from historical data, were generated for each events defined in the IGTM Controller.For example, "Rate of Event" such as the flight speed between the FMF and the touchdown was defined by SOSS of a specific type of airplane, e.g.B737-800, with a specified speed variation.Rate of Events for gate turnaround, e.g., passenger deplaning, cabin services, and boarding, were obtained from References [7,8].BAI data were also stored on the Mongo Server to be accessed by the BAI App. Surface Operations Simulator and Scheduler (SOSS)SOSS is a NASA developed Fast-Time simulator, which was used to simulate flights arriving and departing from Terminal A of DFW, with arrivals on runway 17C and departures on 17R.SOSS was connected through a Java Messaging Service (JMS) Interface which provided the Actual events and the simulated clock time. SOSS AdapterThe SOSS Adapter is the fast-simulation translator, while the SOSS component is the Fast-simulation message emitter/consumer that reads/writes in scenario data from files.The SOSS Adapter translates messages from a proprietary socket connection structured data stream and converts each packet into JSON or Serialize Data, which is then transported over the ActiveMQ message bus. IGTM GUIThe Control Panel of the IGTM GUI is shown in the top of Figure 4, which allows the user to configure the environment to observe flight data associated with the Airport, Terminal, Spot, and Departure Runway.The Control Panel also provides the user with Collaborative Decision Making (CDM) use case options.The Dashboard, which displays flight status and predicted time events, is shown in the bottom of Figure 4.The color code on the right describes the estimated bounds based on the standard deviation derived by the BAI.A light Green of an event represents a likelihood of an event would be completed within one standard deviation of the scheduled event time or about a 68 percent of successful probability.A light Yellow indicates the event would be completed between 1 and 2 standard deviations or about a 95 percent of successful probability.A Red indicates the event would be completed greater than 2 standard deviations or there is only an about 5 percent of chance to meet the scheduled time.The purpose of the color code is to give users a direct implication of the success rate of completing a given event under the uncertainties the BAI data are generated.Therefore, performance bounds can be established based on the dependencies among performance parameters and specified uncertainties.For gate turnaround performance at the gate, a Gate Status display can be selected by the users from the Dashboard for a given flight as shown in Figure 5.The display shows the same color code topology and the standard deviation (σ or Sigma) in minutes.Users can then associated the color code to the time objectively. ActiveMQA messsage 'event' can be defined as "a change in state."In the IGTM application events are as simple as 'an aircraft touches down', 'the aircraft reaches the gate', 'another aircraft has all baggage removed," or various other changes in an aircraft's state of location or activity as shown in Figure 3 in the Gate-Turn Model.IGTM software components handle numerous events.An ATM's system architecture may treat this state change as an event whose Gate""""A16"PushBack DeNicing Outbound2Taxi2SpotDeparture2Slot TakeNoff occurrence can be made known to other processes within the application architecture.From a formal perspective, what is produced, published, propagated, detected, or consumed is a (typically asynchronous) message called the event notification, and not the event itself, which is the state change that triggered the message emission.Events do not 'travel', they just occur.However, the term event is often used metonymically to denote the notification message itself, which may lead to some confusion.This architectural pattern was used in the design and implementation for transmitting events among loosely, coupled software components and services.The IGTM event-driven system consists of event emitters/agents, event consumers/sinks, and event channels.These channels, or collection of channels, are also referred to as the message bus.The emitters have the responsibility to detect, gather, and transfer events.Event emitters are unaware of a consumer of events, when a consumer does exist the event emitters do not know how the event is used or further processed.Sinks have the responsibility of applying a reaction as soon as an event is presented.These emitter/consumers components are the Dashboard, Controller, Big Data Analytics, AOC, and the SOSS Adapter.The Apache ActiveMQ broker fulfills the event channel role.Event channels are conduits in which events are transmitted from event emitters to event consumers.The knowledge of the correct distribution of events is exclusively present within the event channel.The physical implementation of event channels can be based on traditional components such as message-oriented middleware or point-to-point communication.The selection of ActiveMQ as the messaging broker conduit was based on its ease of configuration, its support in other third party API and its ability to handle various types of payload data.One such data payload type is JSON.In the purposes of IGTM the ActiveMQ message bus use was to simulate the NEMS/SWIM message bus (also ActiveMQ). Mongo Server or MongoDBNoSQL databases have emerged in recent years to provide the performance, scalability, and flexibility required of modern applications.This new wave of databases is much better suited for Big Data applications and agile software development practices than its relational counterparts.Mongo was selected because it is one of the leaders in the NoSQL arena and that it couples with other application frameworks.The framework selected for rapid application development was SpringFramework.NoSQL databases offer many benefits, including:• Flexible Data Model.Unlike relational databases, NoSQL databases easily store and combine any type of data, both structured and unstructured as JSON.• Elastic Scalability.MongoNoSQL databases scale out on low cost, commodity hardware, allowing for almost unlimited growth.• High Performance.NoSQL databases are built for great performance, measured in terms of both throughput and latency.These advantages account for the growing popularity of NoSQL databases, and specifically MongoDB.MongoDB stands apart from its peers with its Nexus Architecture that incorporates the strengths of relational databases along with the innovations of NoSQL.MongoDB is the only NoSQL options, which offer an expressive query language, strong consistency, and secondary indexes.IGTM chose MongoDB for this reason and that it mates easily to changes the data model and to not have to tinker with the data layer code.Mongo does all the work for you.Mongo also makes it easily possible to work with many of the Big Data Analytic tools such as Tableau, JasperSoft, OpenRefine, Knime, NodeXL, Import.io and others because of the simplicity of the Mongo Query language. USE CASESTwo use cases, i.e., early arrival with gate conflict and gate recovery of a late arrival, of the IGTM prototype were demonstrated.Figure 6 shows a CDM display of gate conflict due to an early arrival.The IGTM Controller would identify available gates, which could be available for the estimated arrival time and required turnaround time if applicable, and display on the Gate Availability display.This will allow the user to identify and select an available option, which may require coordination among stakeholders, with minimum time lost at the tarmac, cost, and ground crew resources.The second use case was to demonstrate a speed-up gate turnaround in order to meet the Scheduled pushback time due to a late arrival.The IGTM Controller would identify the most critical path among all critical paths and allow the user to adjust the time performance within the available resources or methods based on AOC data or BAI data.The user used the Gate-Turnaround Management display as shown in Figure 7 to speed up the Passenger Deplane rate, Passenger Boarding rate, and increase the number of cabin service (or cleaning) crew, typical methods to recovering lost time at the gate.In this case, the Estimated turnaround time was reduced from original 52 minutes to 43 minutes. CONCLUDING REMARKSThe IGTM prototype demonstrated the concept and benefit of technologies that provide a stream of real-time analytics combined with historic archived data that bound the uncertainties in a gate turnaround NAS operational space.NAS stakeholders can share the flight information, resources, and time management tools through a common messaging network service to coordinately improve the NAS performance under the nominal and off-nominal conditions.The prototype also offers a modular design to incorporate additional Big Data and Analytics products to support future ATM research.2. AOC App, to simulate the Airline Operational Control Center 3. BAI App, to simulate the Big Data/Analytics interface and provide the analytical data.4. Surface Operations Simulator and Scheduler (SOSS), to simulate live traffic data. FigureFigure 1.The IGTM concept Figure 3 .3Figure 3. Data flow of the IGTM events Figure4Figure4.The IGTM prototype's Control Panel FigureFigure 6.A Gate Availability display for gate conflict mitigation )be)modified)by)users On)the)critical)path If)the)entry)is)greater)than)the)maximum)assigned)valued)as)described)in)Appendix)D,)set)the)value)to)the)maximum)and) set)the)background)to)RED Table 1 . Critical paths during the gate turnaround events1Critical PathsSequence of Events (from left to right)1Deplaning of passengersCabin servicesBoarding of passengers2Baggage unloadingBaggage loading3Catering services4Deplaning of passengersFuelingBoarding of passengers5Maintenance ACKNOWLEDGEMENTSThis work was funded by a NASA Big Data, Data Analytics, and Net-enabled ATM and Airspace Operations Project under Contract NNA15AB05C.Authors wishes to thank Deepak Kulkarni and Yao Wang of NASA Ames Research Center for their technical guidance and advice.Authors wish to thank industrial team, which include Joe Burns of XCELAR Inc., Steve Koczo and Arlen Breiholz of Rockwell-Collins, Henry Smith and Warren Qualley of Harris Corp., Randall Ho of the IBM Software Group Federal, Bruce Sawhill of the NextGen Aero Sciences, and Ben DeCosta of DeCosta Consulting LLC, for the concept development.Authors also wish to thank John Walker and Darrell Wooten of the SAIC software development group for their support in developing the IGTM prototype. He has been working on a wide range of flight simulations, including fixed-wing and rotorcraft, and NextGen projects as well as unmanned aircraft systems.He has a Master Degree in Aeronautics and Astronautics from Stanford University, a Master Degree in Mechanical Engineering from Oregon State University, and a Bachelor Degree of Science in Industrial Engineering from Chung Yuan University. is the technical lead for NASA's FutureFlight Central facility and the software manager of the Airspace Traffic Generator system.Carla currently works in the Aerospace Simulation Research and Development Branch at Ames Research Center and has been supporting air traffic management simulation research for over 18 years, covering the en route, TRACON, and airport domains.Her prior research experiences include high-fidelity rotorcraft research simulations.She has a B.S. degree in Mechanical Engineering from California State University at Chico.Chachad has 36 years of engineering experience with real-time flight simulations, and in structural analysis and design.Mr. Chachad has an MBA from San Jose State University, an MS in Civil Engineering from the University of Rhode Island, and a BS in Technology for Civil Engineering from the Indian Institute of Technology. Cloud Computing for Air Traffic Management - Cost/Benefit Analysis LilingRen BenjaminBeckmann ThomasCitriniti MauricioCastillo-Effen 10.2514/6.2014-2582 14th AIAA Aviation Technology, Integration, and Operations Conference American Institute of Aeronautics and Astronautics June 2014 Cloud Computing for Air Traffic Management -Cost/Benefit Analysis Ren, L; Beckmann, B; Citriniti., T., and Castillo-Effen, M: "Cloud Computing for Air Traffic Management - Cost/Benefit Analysis" (16-20 June 2014, 14th AIAA Aviation Technology, Integration, and Operations Conference) M;Ebbers AAbdel-Gayed Addressing Data Volume, Velocity, and Variety with IBM InfoSphere Streams V3.0 March 2013 Ebbers, M; Abdel-Gayed, A; and et al.: "Addressing Data Volume, Velocity, and Variety with IBM InfoSphere Streams V3.0," (March 2013) System Wide Information Management (SWIM): Program overview and status update JimRobb 10.1109/icnsurv.2014.6820078 2014 Integrated Communications, Navigation and Surveillance Conference (ICNS) Conference Proceedings IEEE August 2015 Air Transportation Information Exchange Conference Robb, j.: "System Wide Information Management (SWIM) Program Overview and Status Update," Air Transportation Information Exchange Conference (August 2015) Airport Gate Scheduling for Passengers, Aircraft, and Operations SangHyunKim EricFeron John-PaulClarke AudeMarzuoli DanielDelahaye 10.2514/1.d0079 Journal of Air Transportation Journal of Air Transportation 2380-9450 25 4 2013. April 17, 2013 American Institute of Aeronautics and Astronautics (AIAA) Kim, S.H., et al.: "Airport Gate Scheduling for Passengers, Aircraft, and Operations, "Tenth USA/Europe Air Traf- fic Management Research and Development Seminar, ATM2013 (April 17, 2013). Airport Characterization for the Adaptation of Surface Congestion Management Approaches MSandberg Air Traffic Management Research and Development Seminar 2013. April 17, 2013 ATM Sandberg, M., et al.: "Airport Characterization for the Adaptation of Surface Congestion Management Approaches," Air Traffic Management Research and Development Seminar, ATM2013 (April 17, 2013) Architecture and capabilities of a data warehouse for ATM research MichelleEshow MaxLui ShubhaRanjan 10.1109/dasc.2014.6979560 2014 IEEE/AIAA 33rd Digital Avionics Systems Conference (DASC) IEEE October 2014 Eshow, M. and Lui, M.: "Architecture and Capability of Data Warehouse for ATM Research," 33 rd Digital Avionics Systems Conference (DASC) (October 2014) Hugh Waddington and Howard White: Farmer field schools—from agricultural extension to adult education ElskeVan De Fliert 10.1007/s12571-014-0378-9 Food Security Food Sec. 1876-4517 1876-4525 6 5 May 2014. February 2015 Springer Science and Business Media LLC Airbus A319 Aircraft Characteristics for Airport and Maintenance Planning. Retrieved May 2014 from http://www.airbus.com/fileadmin/media_gallery/files/tech_data/AC/Airbus-AC_A319_May2014.pdf Boeing B752-200/300 Airplane Characteristics for Airport Planning. Retrieved February 2015 from http://www.boeing.com/assets/pdf/commercial/airports/acaps/757_23.pdf |